Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wp-migrate-db domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /chroot/home/a5e40f75/staging.grondinconstruction.com/html/wp-includes/functions.php on line 6131
Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /chroot/home/a5e40f75/staging.grondinconstruction.com/html/wp-includes/functions.php on line 6131
When the City of Saco started the planning process for the Ready Seafood project, they knew they needed to extend their sewer infrastructure to support not only this new business but also other current and future businesses along the busy, Route 1 corridor. R.J. Grondin & Sons was the successful low bidder on this sewer main infrastructure project. The project consisted of connecting into an existing sewer manhole on Route 1 and running the new 8” sewer main in the southbound travel lane, northward up Route 1 for approximately 2,000 lineal feet as well as lateral services for individual businesses. Depths of the excavations ran between 8 and 15 feet deep. After installation of the new pipe and sewer manhole structures, the Route 1 travel lane had to be restored to Maine Dept. of Transportation specifications, which were all done, inspected and ahead of schedule so Ready Seafood could open on time.
Fill out this form and we’ll be in touch shortly.