Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wp-migrate-db domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /chroot/home/a5e40f75/staging.grondinconstruction.com/html/wp-includes/functions.php on line 6131
Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /chroot/home/a5e40f75/staging.grondinconstruction.com/html/wp-includes/functions.php on line 6131
The University Commons building and outdoor lawn area is the new central meeting space for the University of New England’s Biddeford Campus, which sits right on the waterfront of the Saco River. The new building has amenities such as multiple dining services, study areas, meeting areas, and many academic and career services. The location of this building is between two existing buildings so work had to be scheduled and coordinated to create minimal disruption to the existing operations of the campus. R.J. Grondin & Sons did all the excavation and backfill for the new building foundation for the general contractor doing the building work. All underground utilities such as drainage, sewer, water and gas were extended from existing nearby locations. The project also includes some beautiful landscaping with granite walkways and seating near the waterfront with spectacular views. The project was completed on time and within budget.
Fill out this form and we’ll be in touch shortly.